Practical completion liquidated damages in construction contracts /Lai Sze Ching

Lai, Sze Ching (2009) Practical completion liquidated damages in construction contracts /Lai Sze Ching. Masters thesis, University of Malaya .

[img]
Preview
PDF (Thesis Masters)
Download (40Mb) | Preview

    Abstract

    Practical completion is a term widely used in construction contract. However, there is unfortunate there is no firm legally define meaning for the term the court had define it nonetheless there is no single view that is acceptable universally by the court.

    Item Type: Thesis (Masters)
    Additional Information: Dissertation (M.A.) – Faculty of Law, University of Malaya, 2009.
    Uncontrolled Keywords: Construction contracts; Legal view
    Subjects: K Law > K Law (General)
    Divisions: Faculty of Law
    Depositing User: Mr Mohd Zaki
    Date Deposited: 29 Dec 2017 16:25
    Last Modified: 29 Dec 2017 16:25
    URI: http://studentsrepo.um.edu.my/id/eprint/8172

    Actions (For repository staff only : Login required)

    View Item